Traffic
TF-5: anatomy of a traffic jam
117,791 vehicles a day past the fire station, almost as many vehicles as people on the island, a third lane that will take 35 months to build and free buses that broke every record but did not empty the motorway. Why the TF-5 jams and what actually helps.
6 min read · 10 sources · Updated October 2026
Autopista TF-5 at La Laguna · Foxbasealpha, public domain
In short
- The busiest point of the TF-5, by the fire station near Padre Anchieta, carried an average of 117,791 vehicles a day in 2025, the highest figure on the island.1
- The Canaries have about 830 vehicles for every 1,000 inhabitants; Tenerife has more than 792,000 vehicles for about 950,000 people.2
- A third lane towards Santa Cruz between Guamasa and Tenerife Norte airport, worth 58 million euros, starts in November 2026 and will take 35 months.3,4
- Free buses for frequent users pushed TITSA to a record 87 million passengers in 2025, but traffic did not fall at the same rate, because many new passengers used to walk or not travel at all.5,2
The busiest road in the Canaries
The TF-5, the northern motorway, links Santa Cruz with La Laguna, Tenerife Norte airport and the whole north coast as far as Los Realejos. Its first kilometres are where the island's main city, its university town, its airport and its commuter belt meet, and they are where it stops every morning.
The Cabildo's own traffic counts for 2025 put 105,230 vehicles a day at the Campus de Guajara station and 117,791 at the Bomberos station, the highest average on the island.1 Further up, between Guamasa and the airport, the regional government counts more than 110,000 vehicles a day with peaks above 12,000 vehicles an hour.4 For comparison, one of the most congested stretches of Madrid's M-40 carries about 185,000 vehicles a day. Measured as demand against capacity, a university study quoted in the press gives the M-40 a ratio of 3.08, Gran Canaria's GC-1 2.80 and the TF-5 2.75.6
How much time does it cost? There is no official figure. One newspaper's back-of-the-envelope estimate, assuming 20 minutes of queue in the morning and 15 in the afternoon on 240 working days, comes to about 140 hours, almost six full days a year stuck on the TF-5.6

Almost one vehicle per person
The root of the jam is simple arithmetic. In August 2026 the Canaries had 2,012,450 vehicles, more than 830 for every 1,000 inhabitants; La Palma reaches 942.2 Another analysis ranks the archipelago seventh in the world by density, behind places like San Marino, Guernsey and Andorra.7 Tenerife alone has more than 792,000 vehicles for about 950,000 people.2 Registrations run at about twice the pre-pandemic pace, and rental fleets for tourists are a large part of the growth.2,7
The fleet is also old: 51% of passenger cars are over 15 years old and one in three is over 20, while fully electric cars are around 1%.7,2
Free buses: a record, not a cure
Since January 2023 frequent users of TITSA buses and the tram travel free with the Bono Residente Canario and other passes, and the Cabildo extended it for the whole of 2026.8 The effect on ridership was huge: 87.3 million bus passengers in 2025, five million more than in 2024 and 40 million more than before free travel. The tram carries around 25 million passengers a year.5,8
But a motorway does not empty just because buses fill up. The analyses quoted in the press point out that many new passengers previously walked, paid or did not make the trip at all, so traffic did not fall at the same rate.7 The Cabildo itself says TITSA offered 160 million seats in 2025, twice as many as were filled.5

What is being built
- Third lane Guamasa to Tenerife Norte, towards Santa Cruz. Awarded to a Ferrovial and Asyota joint venture for 58,182,981 euros, against a budget of 66.4 million. It includes new Guamasa and San Lázaro junctions and a direct link into the airport. Works start in November 2026, will run 24 hours a day in shifts and last 35 months; the number of lanes is to be kept, but some will be narrowed.3,4,9
- The Padre Anchieta pedestrian ring. A 100-metre circular footbridge over the busiest roundabout, opened in May 2026 after five years of works and a cost overrun of 4.3 million euros, reaching 13.1 million. Whether it reduces queues is still unknown.1
- The TF-24 underpass. Since May 2023 a ramp takes about 3,500 vehicles a day from La Esperanza straight onto the TF-5 without crossing the Padre Anchieta roundabout.1
The TF-5 in numbers
117,791
vehicles a day at the Bomberos counting station in 2025, the highest on the island.1
12,000+
vehicles an hour at peak between Guamasa and the airport.4
792,000+
vehicles on Tenerife for about 950,000 people.2
87.3 million
TITSA bus passengers in 2025, a record.5
~6 days
a year a daily commuter can lose in TF-5 queues, by a newspaper's estimate.6
Common myths
Myth
A third lane will end the jams.
Myth
Free buses emptied the roads.
Myth
The TF-5 is worse than anything on the mainland.
Fact
Madrid's M-40 carries more vehicles and has a worse demand-to-capacity ratio; the TF-5 is close behind.6
What to do
- If you live here, get the Bono Residente Canario: with frequent use (in Tenerife, 30 trips a quarter or 10 in the 30 days before topping up) your bus and tram journeys are free.8,10
- Combine bus and tram: the tram links La Laguna, the university, the hospitals and central Santa Cruz without touching the TF-5.
- If you must drive, shift your journey: even 30 minutes earlier or later makes a big difference at the Padre Anchieta and Guajara pinch points.
- From November 2026 expect narrowed lanes and changes at Guamasa, San Lázaro and the airport junction; check the Cabildo and 112 traffic notices before leaving.
- Going to Tenerife Norte for a flight? Leave a large margin during the works.
Notes and sources
- 1.Diario de Avisos, "La pasarela del Padre Anchieta se abre el lunes tras 5 años y 4,3 millones de sobrecoste", 16 May 2026 (2025 traffic counts from the Cabildo's road service). diariodeavisos.elespanol.com
- 2.Diario de Avisos, "Canarias ya tiene más coches que Dinamarca o Uruguay", 26 August 2026 (ISTAC and DGT data). diariodeavisos.elespanol.com
- 3.RTVC, "Adjudicada la obra del tercer carril de la TF-5", 10 September 2026. rtvc.es
- 4.Diario de Avisos, "Obras del tercer carril de la TF-5: 35 meses de trabajos", 20 October 2026. diariodeavisos.elespanol.com
- 5.Tenerife Weekly, "Titsa achieves record in 2025 with over 87 million passengers, marking a 6.1% increase", 19 January 2026. tenerifeweekly.com
- 6.Irene Cartaya, "Atascos en Tenerife: las colas de la TF-5 roban hasta seis días al año a los conductores", Atlántico Hoy, 24 November 2025 (traffic data from the Cabildo and the Ministry of Transport, end of 2024; demand-capacity ratios from a university study by engineer Oliver Castilla). atlanticohoy.com
- 7.Canarias Ahora, "Casi tantos coches como habitantes: las claves que apuntan a que los planes de movilidad en Canarias no están funcionando como deberían", 27 September 2026. eldiario.es
- 8.Irene Garuti, "Tenerife mantiene en 2026 la gratuidad del 100% en guaguas y tranvía para residentes", El Digital Sur, 11 December 2025. eldigitalsur.com
- 9.COPE, "El Cabildo de Tenerife garantiza que la TF-5 mantendrá sus carriles abiertos durante las obras de ampliación", 23 October 2026. cope.es
- 10.Tus Ayudas, "Bono residente canario 2026: cuántos viajes y precio por isla" (minimum trips for free top-ups in Tenerife). tus-ayudas.es
Keep reading

Water
Tenerife drinks from inside the volcano

Sewage
What goes into the sea

Housing
Housing in numbers

Politics
Who governs the Canaries, and what comes next

Teide
How to legally stand on top of Teide

Volcano
The volcano under watch

Shopping
Why a parcel from Madrid can cost more than one from China

Population
Who lives on Tenerife

Hotels
Who owns Tenerife's hotels

Economy
What Tenerife lives on

Weather
Tenerife's weather, floor by floor

Food and restaurants
Tenerife at the table